![]() ![]() When Operational Planning Analysis is completed and when Operating Plans have been identified Facility Ratings and overload relay trip settings (including time-delay) on those Facilities (transformers and transmission lines) that are part of Bulk Electric System and their overload trip settings are below 125% of the highest Facility rating.In other words, the topology view has no background maps. ! The background of the topology view is Empty map by default. ! You can only switch the background maps of the topology views. End 4.10 Switching Background Maps Description Two views, topology view and map view, are available in the M2000. ![]()
0 Comments
Leave a Reply. |
AuthorWrite something about yourself. No need to be fancy, just an overview. ArchivesCategories |